Task Description

Task name :

Update R0203(E200-3)

Leading committee and working group owning the task: ENG WG 1
Tasks associated (*leading) :
Task Leader : Lingyan Wang
Task Number : ENG-2.1.6
Standards : S1020 Marine Aids to Navigation Design and Delivery
Topic area : S1020.2 Design, Implementation & Maintenance
Task Description :

Update E200-3 on Light measurement into a guideline

Objectives of the task :
Expected outcome :

New Guideline

Compelling need :
Strategic Alignment :

O1 - Innovate, improve, and harmonise Marine Aids to Navigation constantly reflecting changing technology & system obsolescence, changing user needs, operational imperatives, environmental sustainability, and best practice.

O2 - Develop applicable international standards, recommendations and guidelines for adoption and use by its members and other relevant organizations or parties.

O3 - Offer its members a professional forum to share operational experiences, new techniques and technologies and issues of common interest and concern.

O4 - Improve the provision and harmonisation of Marine Aids to Navigation globally, through targeted training, technical cooperation, and capacity building initiatives.

Scope :
Cybersecurity related :

No

Brief and concise description of the work : to be undertaken and programme mile-stones (where appropriate).

To publish an interin guideline based on E200-3 with only editorial changes and once the new version updated now is available, this new verison will be released.

Expected numbers of sessions for completion :
293 Session 17 293 Session 18 293 Session 19 293 Session 20 293 Session 21 293 Session 22 293 Session 23
+ + + v v

Meaning of symbols for sessions :

v + x > <
Scheduled Progressed Not progressed Finalised On hold
Committee notes : Origins :
Approved by Council (Council session/Date) : 0
Notes from the council :
Status (Text) : This task is on-gonging since ENG17.
Status (Color) :
On track
Remarks :

History of the task :

2024-10-24 07:31:17

The first input paper (ENG19-3.1.1.7) on this subject was received from China MSA, and Lingyan Wang presented it in the WG1 opening plenary. The Task Group has decided to include this input paper to the new light measurement guideline to give the measurement guidance for the on-site measurement. An second input paper (ENG19-3.1.1.10) on this subject was received from Alwyn Williams. Alwyn introduced it in the task group meeting and The Task Group has decided to include this input paper to the new light measurement guideline to provide a correction method to the measurement that are made outside the standard test conditions. The task group reviewed the new structure of the draft guideline which is basically harmonise that of the Recommendation R0203. All the guidance which are necessary for conducting one complete measurement will be kept in the main body, other detailed knowledge will be moved into the Annex to give the further guidance. Considering there is not any IALA published document about the light measurement at present, which is very useful for the IALA members and other stakeholder, suggested by Omar Eriksson, the task group decided to publish an interim guideline base on E200-3, which will be replaced once the new measurement guideline is finalised.

Download IALA-Guideline-Gxxx Light Measurement-Lingyan.docx Download ENG17-3.1.1.13.2 ANNEX B Draft IALA Guideline - Measurement of Marine Lights Performance 1- ENG19.docx

2024-10-24 07:37:33

The first input paper (ENG19-3.1.1.7) on this subject was received from China MSA, and Lingyan Wang presented it in the WG1 opening plenary. The Task Group has decided to include this input paper to the new light measurement guideline to give the measurement guidance for the on-site measurement. An second input paper (ENG19-3.1.1.10) on this subject was received from Alwyn Williams. Alwyn introduced it in the task group meeting and The Task Group has decided to include this input paper to the new light measurement guideline to provide a correction method to the measurement that are made outside the standard test conditions. The task group reviewed the new structure of the draft guideline which is basically harmonise that of the Recommendation R0203. All the guidance which are necessary for conducting one complete measurement will be kept in the main body, other detailed knowledge will be moved into the Annex to give the further guidance. Considering there is not any IALA published document about the light measurement at present, which is very useful for the IALA members and other stakeholder, suggested by Omar Eriksson, the task group decided to publish an interim guideline base on E200-3, which will be replaced once the new measurement guideline is finalised.

Download ENG19-3.1.1.7 AtoN Detection System Based on Image Processing Technology.docx Download ENG19-3.1.1.10 Input paper on Correcting for Temperature in the Measurement of Lights FINAL.docx